Upgrading of the Existing Storage and Truck Loading Facilities
at Perama, Attica

of Shell Hellas S.A.

The project concerns the upgrading of the existing truck loading station, consisting of dismantling works of 8 out of 14 existing top loading islands, construction of 5 new bottom loading islands, expansion of trucks manoeuvring area, replacement of 11 pumps and reconstruction of fuels pumping station, modifications to interconnecting pipework, installation of loading gantries automation system and vapour recovery unit and reconstruction and extension of the electrical substation.

Provided Services

  • Basic design
  • Detail design / engineering of civil works, structural works, mechanical and electrical installations, as well as instrumentation / automation systems
  • Assist Owner in equipment procurement
  • Time and cost planning, scheduling and control, reporting
  • Construction tender documents preparation, tender issue, bids evaluation and contracting
  • Construction management and supervision
  • Construction contract administration
  • Fulfilment verification of contractor’s quality assurance/quality control system
  • Fulfilment verification of contractor’s health safety and environmental protection systems
  • Support project handing over and acceptance by the Owner

Project  Budget: € 3.2 million
Services  Implementation Period: 1997 – 2000