Water Bottling Plant, at Stymphalia

of Natura Bottling S.A.

The project concerns the construction of a water bottling plant of 4,840 m2 total covered area and surrounding area works in a plot of 23,500 m2 total surface. The plant consists of the structural steel building, housing the production unit for the bottling of natural mineral water, transported through a 3.5 km long pipeline and the products warehouse, as well as the administration and utilities building made of reinforced concrete. The surrounding area works include roads, paving, parking area and underground networks.

Provided Services

  • Project management
  • Time and cost planning, scheduling and control, reporting
  • Basic design, design for building permits and detail design / engineering of building works, civil works, structural works, mechanical and electrical installations
  • Permits acquisition from authorities
  • Tender documents preparation, tender issue, bids evaluation and contracting
  • Construction management and supervision
  • Construction contract administration
  • Fulfilment verification of contractor’s quality assurance/quality control system
  • Fulfilment verification of contractor’s health safety and environmental protection systems
  • Commissioning, performance tests and start up assistance
  • Project handing over and acceptance

Project  Budget:  € 7.0 million
Services  Implementation Period: 2005 – 2007