Production And Office Facilities Building At Peania Attica
of Naftemporiki S.A.
The project concerns the construction of a structural steel building consisting of production facilities, raw materials store, office facilities and utilities area of 2,350 m2 total covered area and 11 m height, as well as surrounding area works in a plot of 5,300 m2 total surface..

Provided Services

  • Project Management
  • Design Coordination
  • Detail design / engineering for civil works, structural works, mechanical and electrical Installations
  • Environmental impact assessment study
  • Permits acquisition from authorities
  • Tender documents preparation, tender issue, bids evaluation and contracting
  • Time and cost planning, scheduling and control, reporting
  • Construction management and supervision
  • Construction contract administration
  • Fulfilment verification of contractor’s quality assurance/quality control system
  • Fulfilment verification of contractor’s health safety and environmental protection systems
  • Commissioning, performance tests and start up assistance
  • Project handing over and acceptance

Project  Budget:  € 2.8 million
Services  Implementation Period: 2004 – 2007