Natural Gas Transmission System – 4th Group of Metering Stations
U-6650 at Thisvi, Viotia, U-2830 (AdG B) at Distomo, Viotia
and U-7140 (MOTOR-OIL B) at Ag. Theodori, Korinthos
of Hellenic Gas Transmission System Operator (DESFA) S.A.
![thisvi-1](https://new.cmengineering.gr/wp-content/uploads/2022/02/thisvi-1.jpg)
The Project concerns the construction of three natural gas Metering Stations with maximum design flow rate of 100,000 Nm3/hr each at operating pressure 80 barg, located at the delivery points for natural gas to the power stations of:
The Project includes metering installations, inlet filters, analyzers, ESD valves, control valves, process pipework, vents, cathodic protection, switchboards, diesel generators, electrical, instrumentation and controls, buildings, shelters, landscaping, roads and fencing. |
Provided Services
|
Project Budget: € 5.4 million |