Natural Gas Transmission System – 4th Group of Metering Stations
U-6650 at Thisvi, Viotia, U-2830 (AdG B) at Distomo, Viotia
and U-7140 (MOTOR-OIL B) at Ag. Theodori, Korinthos

of Hellenic Gas Transmission System Operator (DESFA) S.A.

The Project concerns the construction of three natural gas Metering Stations with maximum design flow rate of 100,000 Nm3/hr each at operating pressure 80 barg, located at the delivery points for natural gas to the power stations of:

  1. “THISVI A” Power Plant at Thisvi, Viotia,
  2. “KORINTHOS POWER” Power Plant at MOH SA- Ag. Theodori, Korinthos,
  3. “PROTERGIA (ENDESA/ADG B’)” Power Plant at ALUMINIUM SA – Aghios Nikolaos, Distomo, Viotia.

The Project includes metering installations, inlet filters, analyzers, ESD valves, control valves, process pipework, vents, cathodic protection, switchboards, diesel generators, electrical, instrumentation and controls, buildings, shelters, landscaping, roads and fencing.

Provided Services

  • Detailed Design/Engineering of building works, structural works, mechanical and electrical installations for all buildings
  • Detailed Design/Engineering of civil works, concrete structural works, steel structures of process area as well as of the surrounding area works
  • Detailed Design/Engineering of main and secondary pipes
  • Permitting by Authorities

Project  Budget:  € 5.4 million
Services  Implementation Period: 2013 – 2014