Revithoussa LNG Terminal Expansion
of Hellenic Gas Transmission System Operator (DESFA) S.A.
![revithousa-1](https://new.cmengineering.gr/wp-content/uploads/2022/02/revithousa-1.jpg)
The project, partially funded under the European Union Community Support Framework III, concerns the Revithoussa island LNG terminal expansion. This expansion increased the Peak Sendout Rate from 500 m3/h to 1,250 m3/h of LNG to the national grid and the LNG unloading capacity from 3,500 m3/h, via two unloading arms by ships of capacity 25,000 m3, to 7,250 m3/h via three unloading arms by ships of capacity 75,000 m3. |
Provided Services
|
Project Budget: € 45 million |