Natural Gas Border Metering Station, Dehydration Facilities and
Building Installations, at Strymonochori

of Public Gas Corporation of Greece (DEPA) S.A.

The project concerns fiscal and custody transfer metering of gas exported from Russia via Bulgaria into National Gas Transmission System. The project includes metering installations consisting of inlet filters, chromatographs, analysers, control valves, process pipework, vent and vent pipework, heaters and boilers, switch boards, diesel generators, transformers, instrumentation and controls, as well as, buildings facilities of 3,600 m2 total covered area consisting of administration building, maintenance and garage building, warehouse, fire station building, utilities building, metering house, guard house, as well as surrounding area works in a plot of 50,000m2 total surface.

Provided Services

  • Design / engineering coordination
  • Detail design / engineering of building works, structural works, mechanical and electrical installations of all buildings, civil and concrete and steel structural works of process area and surrounding area works, including landscaping, underground networks, roads, paving
  • Preparation of civil contractor’s quality assurance / quality control manual

Project  Budget: € 13.2 million
Services  Implementation Period: 1995 – 1996