150 MWe Early Power Plant in Rumaila Oil Field, IRAQ
The Project concerns a 150 MWe Power Plant to be constructed in Rumaila Field, Iraq corresponding to the early phase of power generation for the area. The Power Plant is a standalone simple cycle facility, comprising 5 heavy industrial type Gas Turbines with fuel gas being piped in from the local degassing stations. The Power Plant includes pipelines for the transporta-tion of the gas complete with valve stations, fuel gas conditioning system, step up and step down transform-ers, 132kV GIS switching station and OHTL, flare pack-age, nitrogen package, diesel fuel package, WTP, WWTP, compressed air package, coolers, electric diesel generators, fire protection systems, MV/LV/DC switchboards substations and networks, control panels, PMS, ICSS systems, I&C, buildings and building ser-vices, HVAC, civil infrastructure, etc. |
Provided Services Provision of engineering / design services to the Consortium CSPC-CCC-DANWAY for participation to Tender, including:
|
Project Budget: €100 million Services Implementation Period: 2013 |